Denver Sluice
Denver Sluice, near Downham Market in Norfolk, is the gate that holds the sea back from a large part of the Fens, where the tidal Great Ouse meets the non-tidal Ely Ouse. The first sluice, raised by the Dutch engineer Cornelius Vermuyden after the Hundred Foot Drain was cut, was widely condemned, was blown out by a tide in 1713, and was rebuilt in 1750 by Charles Labelye. The present Grade II listed sluice and bridge are John Rennie the Younger's work of 1834, enlarged in 1923, and today they stand at the heart of the Denver Complex of sluices and channels that protects the South Level. It is also known as the Denver Complex when the neighbouring sluices are counted with it.
Timeline
1651: Construction
Cornelius Vermuyden has just cut the Hundred Foot Drain, and its bed sits higher than the old river at the junction. To stop the tide running up the Ouse towards Ely, an earth dam is thrown across the old course with a lock beside it for drainage and boats. The tide is forced up the straight new channel instead, and the work is condemned almost at once, because boats can pass only when water stands level on both sides and the river below begins to silt.
1682: Renovation
Three brick arches are set down where the old dam stood, the middle one 18 feet wide and the two outer ones 12 feet. Each carries doors that can be taken out or left open to let the tide in, and the aim is a better waterway for boats.
1713: Disaster
Upland floods undermine the foundations, then a violent incoming tide blows the sluice up and washes the three small arches away. The tides flood the South Level, and the Hundred Foot River turns towards Ely instead of King's Lynn. Merchants in the towns downstream, glad of an open river, campaign against putting the sluice back.
1750: Construction
Despite the merchants' objections, Charles Labelye rebuilds the sluice with wider waterways and lower foundations. A proper navigation lock, about 11 metres by 4, sits on one side, so boats no longer wait for the river to level on both sides.
April 1822: Other
The engineers report that the new Eau Brink Cut at King's Lynn, opened only months before, is already choking, with a bank of sand and mud reaching some 400 feet upstream towards Denver Sluice. They recommend widening the channel. The silt that has dogged the sluice since Vermuyden's day is still the enemy.
1834: Construction
John Rennie the Younger replaces the old works with a brick and ashlar bridge of four arches, whose outer piers extend north and south to form two locks. Three sluice chambers have timber tide gates to the north and the navigation lock is much larger, about 23 metres by 5.5. The lock has four sets of mitre gates because the water may stand higher on either side.
1923: Renovation
The sluice is enlarged to take commercial craft too big for the old lock. A wide navigation sluice known as the Big Eye is added, and the upstream mitre gates of the three small sluices are replaced by lift gates. A new flood gate follows in 1928.
March 1947: Disaster
Thaw, rain and high spring tides combine, and the sluice can be opened only for short spells, so the swollen rivers cannot drain away. Banks break across the Fens and a vast area of farmland goes under water. The flood drives the great post-war plan to rebuild the drainage of the Great Ouse around Denver.
1960: Construction
The Flood Relief Channel is cut from beside Denver to King's Lynn, running along Vermuyden's old line and controlled by the new A. G. Wright sluice at Denver and a tail sluice at Saddlebow. It is the last piece of a ten year, £10 million flood protection scheme begun in 1953 that also brings the Cut Off Channel down from Barton Mills. Together they give the Lark, Little Ouse and Wissey floods a way round the old sluice.
1980s: Renovation
Rennie's sluice is refurbished between 1982 and 1986, and the lock's old doors give way to vertical lift gates. Steel guillotine gates now close the three small sluices on the south side, behind timber tide gates to the north.
2006: Other
Nearly 15 feet of silt is found banked against the downstream doors of the three small sluices, which cannot open. Dry winters have left the river sluggish, and the Environment Agency is blamed by motorists, anglers and boaters alike. Damboards are set in front of the sluices, and by December 2008 air-blasting pipework is in place to clear the silt.