Cressing railway station

Cressing railway station is a single-platform stop on the Braintree branch line in Essex, serving Cressing and Black Notley. It opened in 1848 as Bulford on the Maldon, Witham and Braintree Railway, passed to the Great Eastern Railway and then the London and North Eastern Railway, and was renamed Cressing in 1911. Electric trains replaced diesel units on the branch in 1977, and today Greater Anglia runs an hourly service to London Liverpool Street.

Timeline

15 August 1848: Founding

Goods trains begin running on the new line from Witham to Braintree, built by the Maldon, Witham and Braintree Railway, which Parliament authorised in 1846. Farm produce from the Cressing countryside now has a rail route to the markets of London.

2 October 1848: Founding

The line opens to passengers and the station takes in its first travellers under the name Bulford. The track is laid as double line throughout, a layout that lasts until the time of the Crimean War.

1862: Transfer

The Great Eastern Railway takes over the station and its line. It will run the branch for sixty years, through the arrival of the Bishop's Stortford route at Braintree in 1869.

1 February 1911: Other

The station drops the name Bulford and becomes Cressing, after the village it serves. The new name appears on the nameboards of the little Braintree branch stop.

1923: Transfer

The railway grouping ends the Great Eastern's independence, and Cressing station passes to the London and North Eastern Railway.

October 1977: Other

Electric trains take over from diesel multiple units between Witham and Braintree, so Cressing's trains now run on overhead wires. The old platform signal box has already been taken away to the Colne Valley Railway at Castle Hedingham.