Constantine Road Power Station
Ipswich's municipal electric power station and tram depot, built by Ipswich Corporation on Seven Acre Field beside the River Gipping to drive the town's electric trams and supply lighting. Its decorated frontage was designed by the London architect C. Stanley Peach. Also known as the Ipswich Generating Station, Constantine House and later the Talk Electric Centre, it later passed to Eastern Electricity and was converted to offices and a conference centre, beside a bus depot that still operates. Digging on the site in 1916 also uncovered Palaeolithic flint tools and the bones of mammoth and reindeer.
Timeline
1900: Transfer
Ipswich Town Council buys out the private tramway company for £17,552. The council means to replace the horse trams with electric ones and to bring electric lighting to the borough. A generating station of its own becomes the next step.
1902: Construction
Work starts on the tram depot and power station on Seven Acre Field, by the Gipping. The marshy ground forces the builders to hand-dig a hole about 40 feet square and 40 feet deep and fill it with concrete to carry the chimney stack. C. Stanley Peach of London designs the station's ornamental front.
1903: Founding
The generating station and its eight-track tramshed come into use, and electric trams begin running in Ipswich in place of the horse cars. The station also supplies power for the town's lighting.
1916: Discovery
While Ipswich Corporation builds a coal handling plant at the station, workmen cut through a loam layer about 14 feet down. It holds Stone Age handaxes of Mousterian type together with mammoth and reindeer bones. Flint tools had already turned up on the site in 1903, and a possible blade was recorded in 1918.
1963: Other
The last trolleybus enters the Constantine Road depot, ending the electric public transport that the station was built to feed. The tramshed carries on as a bus depot.