Clare College Bridge, Cambridge
Clare Bridge carries the college's main axial path over the River Cam, and a stone ball on its parapet is missing a slice that has fuelled stories for centuries. Built to a design by Thomas Grumbold in 1638 to 1640, it is the first Classical-style bridge in Cambridge and the oldest still standing in the city. Its three arches lead from Old Court to the Fellows' Garden on the Backs and, since the 1920s, on to Memorial Court. It is also known as Clare Bridge.
Timeline
1638: Construction
Clare begins rebuilding itself around a single court, and a bridge to the far bank is part of the plan. The college has just acquired Butt Close, water meadow beside the Cam that floods often, in exchange for a plot beside King's Chapel. Thomas Grumbold is the designer of the bridge that will carry the college to it.
c. 1640: Other
The second ball from the left on the south parapet has a slice missing. College lore says the underpaid Grumbold cut it out in anger, and another tale says an incomplete bridge escaped the tax on finished ones. The likelier truth is that a cemented wedge worked loose and fell out. It is the first thing guides ask visitors to look for.
1640: Construction
The bridge is finished in Ketton stone, three arches wide, with a balustrade of ball finials and carved relief panels on the pedestals. It is the first Classical-style bridge in Cambridge. To carry the path across the marshy ground beyond, a causeway is laid on a mattress of the heads of forty willow trees, held in place by brick walls.
1642: Other
The Civil War begins and halts the rebuilding of Clare, leaving the new court unfinished while the bridge stands complete. Building does not resume until 1662. Guides add that Parliamentarian forces leave the bridge untouched, one of only two Cambridge bridges said to have been spared.
1662: Construction
Work on the new court restarts after twenty years, and the college slowly grows up around the bridge's approach. Old Court is not finished until 1715, three-quarters of a century after the bridge.
1714: Construction
As Old Court nears completion, a wrought-iron triple gateway with elaborate overthrows is set up at the west end of the bridge, flanked by railings. It guards the causeway to the Fellows' Garden and still stands there.
1779: Other
Lancelot 'Capability' Brown draws up a plan to landscape the Backs by widening the Cam into a serpentine lake. It would sweep away the boundaries between college grounds and the bridges of King's, Clare and Trinity. The plan is never carried out, and Clare Bridge survives.
1924: Construction
Memorial Court opens west of Queen's Road, designed by Sir Giles Gilbert Scott to commemorate Clare men lost in the First World War. The bridge now leads on past the Fellows' Garden to a second court, as well as to the gardens.
1969: Renovation
The bridge is restored, securing the stonework of Cambridge's oldest surviving bridge after more than three centuries of weather and traffic. Grade I listed since 1950, it still carries students and fellows between the college's two courts.