Church of the Sacred Heart, North Walsham
The Roman Catholic church of the Sacred Heart stands on Kings Arms Street, North Walsham. It is an Art Deco building of 1934 to 1935 by the Catholic church architect E. Bower Norris, with reinforced concrete beams in place of nave arcades so the sanctuary is visible from everywhere. It grew from a small mission begun in 1902 and was given to the diocese by the draper Frank Loads and his wife Sarah. It served Catholic prisoners of war in the Second World War and has been Grade II listed since 2003.
Timeline
1904: Founding
Bishop Riddell of Northampton declares North Walsham a separate mission, two years after founding a mission territory centred on Cromer. Frank Loads, a draper who has just become a Catholic through his wife Sarah, turns a loft above his shop garage into a chapel. The Convent of Perpetual Adoration at Cromer donates its furniture.
1929: Arrival
Fr William Arrowsmith becomes the first resident priest in North Walsham. Until now Fr Walmesley Carter has visited from Cromer, and a charabanc has brought Catholics in from the neighbouring villages.
1931: Transfer
Frank Loads buys the Kings Arms Street site for £750, planning a proper church for the growing congregation. Three years later he and his wife give the land to the Diocese of Northampton.
30 August 1934: Construction
Bishop Youens lays the foundation stone. Local builders Cornish and Gaymer, working to E. Bower Norris's design, raise the Art Deco church in just seventeen weeks.
4 April 1935: Founding
The church opens under the Bishop of Northampton, at a total cost of £4,120 including the architect's fees. It is the gift mainly of Frank Loads and his wife, the end of thirty years of worship above a shop.
1940s: Occupation
During the Second World War, Catholic prisoners of war worship in the church. One of them, a German soldier named Adolf Benz, carves the wooden statue of St Joseph that still stands in the narthex.
1960: Founding
North Walsham is constituted a full parish, with the Sacred Heart as its church.
22 June 1990: Other
Bishop Alan Clark of East Anglia consecrates the church, more than fifty years after it opened.
2004: Renovation
A choir loft is built above the western narthex and the sanctuary is rearranged to designs by Anthony Rossi. It follows the opening of the parish hall in 1999.