Canvey Island Methane Terminal

At its height this was the place where Britain's gas came in as a liquid at minus 160 degrees, shipped from the Sahara to Hole Haven on the Thames and stored in tanks holding over 100,000 tonnes. It began in 1959 as the receiving end of the first ocean cargo of liquefied natural gas anywhere in the world, an Anglo-American experiment by the Gas Council. It grew into a permanent terminal fed from Algeria by the Methane Princess and Methane Progress, drew scrutiny as one of Canvey's hazardous industries, and faded once North Sea gas took over. British Gas closed it in 1994, and it now handles propane and butane for Calor Gas. It is also known as the Canvey LNG terminal or the Methane Terminal, and stands on former Scar House Farm land at Hole Haven.

Timeline

20 February 1959: Arrival

The Methane Pioneer, a converted wartime freighter once called Normarti, tied up at Canvey with 2,020 tonnes of liquefied natural gas from Lake Charles, Louisiana. No one has ever shipped gas across an ocean this way before. The Gas Council and its American partners are testing whether LNG can travel safely, and the cargo goes into two 1,000-tonne tanks built for the trial. Seven more deliveries follow over the next 14 months.

1962: Construction

With the trial proved, work starts on a permanent terminal on the old Scar House Farm land that the Gas Light and Coke Company bought in the early 1930s for a coal gas plant that never came. The plan calls for six 4,000-tonne LNG tanks, liquefied petroleum gas storage and a new jetty. Contractors fight through the freezing winter of early 1963 to drive the jetty piles.

12 October 1964: Arrival

The Methane Princess brings the first commercial cargo, 12,000 tonnes of LNG from Arzew in Algeria, and the trial becomes a trade. Local dignitaries watch from the new jetty as the coldest cargo in the world comes ashore. She and her sister Methane Progress then shuttle between the Sahara gas fields and the Thames, with Algerian gas feeding pipelines as far as Romford and Leeds.

1969: Construction

Four huge in-ground tanks, each about 130 feet deep and holding 21,000 tonnes, are dug by McAlpine, with the surrounding soil frozen to hold them. They lift the terminal's storage from about 24,000 tonnes to 108,000 tonnes and mark its peak. The site employs around 250 people.

1978: Other

The Health and Safety Executive publishes its Canvey Report, commissioned after a long fight over new refineries on the island. It lists the British Gas LNG terminal, with some 200 staff, among the hazardous installations. The HSE finds that islanders face more than five times the risk of people in nearby South Benfleet.

April 1980: Other

The Health and Safety Executive serves three enforcement notices on the British Gas Corporation over the terminal. A year later Sir Bernard Braine MP asks in the Commons whether the last has been complied with and whether the safety devices work, and is promised a reply.

c. 1982: Other

The Algerian runs end, and the Methane Princess and Methane Progress leave the Thames, as North Sea gas takes over Britain's supply. The in-ground tanks, which suffered boil-off from fissures in the ground, are emptied and filled with sand, leaving four grass-covered mounds. The terminal keeps a smaller role.

1994: Other

Privatised British Gas closes the terminal and ends LNG imports by sea, and the site is put up for sale. Gas that Canvey pioneered will return to Britain through the Isle of Grain and Milford Haven instead.

February 1998: Conversion

Atlas Gas, which bought the site in 1997, finishes converting the tanks to hold refrigerated propane, about 35,000 tonnes, and sells the terminal to Calor Gas. Calor lays a pipeline to its Coryton filling plant and builds Howards Way to carry road tankers to Haven Road. The old LNG site now imports and stores propane and butane.

2006: Other

Castle Point Council rejects Calor's plan, backed by Osaka Gas and Japan LNG, to turn the site back into an LNG import terminal. Campaigners including People Against Methane and MP Bob Spink had fought it. Calor's appeal inquiry in 2007 ends with the appeal withdrawn at the last minute, and the terminal stays a propane and butane depot.