Cambridge University and Town Waterworks
The first modern piped water supply for Cambridge, run by the Cambridge University and Town Waterworks Company, set up by Act of Parliament in 1853. Its pumping station on Cherry Hinton Road, fed by the chalk springs of Cherry Hinton, lifted water to reservoirs on Lime Kiln Hill and supplied the town and colleges from 1855. Only the engineer's house survives at the Cherry Hinton site. The company later built the steam pumping station at Fulbourn and is the ancestor of today's Cambridge Water.
Timeline
14 June 1853: Founding
Parliament gives its assent to the Cambridge University and Town Waterworks Act, creating a company to bring clean piped water to a town of more than 27,000 people that has relied on wells and polluted streams. The Cherry Hinton springs are chosen as the source, and the colleges and townspeople alike are to be customers.
27 October 1855: Construction
The waterworks on Cherry Hinton Road is opened with a ceremony led by the Master of Trinity, Dr William Whewell, who is the company's chairman. Three boilers drive pumps able to lift 40,000 gallons an hour to reservoirs holding 1,200,000 gallons, and hydrants are placed in every street about ninety yards apart. James Simpson designed the works and George Peters built them.
1860: Other
Five years after the opening, about 1500 premises in Cambridge are connected to the supply. The town is drawing its drinking water from the pipes rather than from pumps and wells.
1883: Construction
Demand has almost outrun supply, so two more wells are sunk at Cherry Hinton to feed the pumps. The strain is a sign that the old station cannot keep pace with a growing town, and the company looks for a second source.
1890: Construction
The company puts a new steam pumping station into service at Fulbourn, built from 1888 and designed by Charles Hawksley in a church-like style. Two beam engines draw water from a well sunk into the chalk, and the station supplies Cambridge, alongside the older Cherry Hinton works.
1921: Other
After nearly seventy years the Cherry Hinton Road station closes, once a new well at Fleam Dyke comes into use. The wells are sealed and the site is sold, leaving the engineer's house as the one reminder of the first waterworks.
1941: Transfer
The company hands the springs and reservoirs at Cherry Hinton over to the city council. The water that began the company's story passes into public ownership.