Cambridge to Mildenhall railway line
A Great Eastern Railway branch running from Barnwell Junction at Cambridge to Fordham and on to a terminus at Mildenhall, in Suffolk. Authorised in 1881, it opened in two stages in 1884 and 1885 and served villages such as Bottisham, Isleham and Worlington. Also known as the Mildenhall branch, it lost its passenger trains in 1962 and its goods service in 1964, a victim of rising road competition and post-war rail rationalisation.
Timeline
18 July 1881: Other
The Great Eastern Railway Act receives Royal Assent, giving the company powers to build a branch from Cambridge to Mildenhall. Years earlier, in 1867, a similar scheme had been turned down by both the Great Eastern and the London and North Western. Now the fenland and Breckland villages along the route have a railway in prospect.
3 January 1883: Construction
The first sod of the new line is cut, and the work of building the branch begins. It will take another year and a half before the first trains can run.
2 June 1884: Founding
The first section, from Barnwell Junction at Cambridge to Fordham, opens to all traffic. A Board of Trade inspector, Major General Hutchinson, passed it only days earlier, on condition that some signal interlocking was altered. Fordham becomes a junction with the existing Ely and Newmarket line.
1 April 1885: Founding
The extension from Fordham reaches Mildenhall, and the terminus station opens after a second Board of Trade inspection on 28 March. The Great Eastern now links the town directly to Cambridge, completing the branch.
20 November 1922: Other
Three new halts open at Fen Ditton, Exning Road and Mildenhall Golf Links, a cheap way of picking up passengers as buses begin to compete. The golf links halt is renamed Worlington Golf Links Halt at the start of 1923.
7 July 1958: Other
Diesel railbuses are put on the line, following diesel multiple units on some services from 1956. It is an attempt to run the lightly used branch more cheaply, but it does not save it.
October 1961: Other
British Railways publishes a proposal to withdraw passenger trains from the Mildenhall branch, based on passenger counts taken in February and July 1961. Replacement bus services are suggested between Mildenhall and Newmarket and between Isleham and Cambridge. Formal closure proceedings begin.
18 June 1962: Other
Passenger services end, and Mildenhall station closes to passengers after 77 years. The last passenger train had run at the weekend, on 16 June. The town is left to the buses.
July 1964: Other
In July the last goods trains run to Mildenhall and the station closes to freight. With that, the branch beyond Fordham is finished.
19 April 1965: Other
The Burwell stub, the last remaining piece of the branch, closes. Only the section into Barnwell Junction at Cambridge survives, later serving an oil terminal until the early 1990s.