Cambridge railway station
Cambridge's only surviving mainline station sits a mile from the colleges at the end of Station Road, and its remarkable feature is a single platform of about 500 yards that served as the only through platform for 166 years. Opened by the Eastern Counties Railway on 29 July 1845 in yellow-brick Italianate style, it passed to the Great Eastern Railway in 1862 and later to the LNER and British Railways. Over the years it has been a meeting point of the Great Eastern, Great Northern, London and North Western and Midland companies, a royal arrival point, the scene of hoaxes and accidents, and the end of the Varsity Line to Oxford. Today it is the busiest station in the East of England, with over ten million passengers a year.
Timeline
29 July 1845: Construction
The Eastern Counties Railway opens its Cambridge station, after a planned 1 July start slips when the track subsides. Designed by Sancton Wood and Francis Thompson and built by William Jackson, it is a long yellow-brick Italianate front with a colonnade of fifteen arches, set a mile from the town. A sixteen-year-old Josiah Chater notes in his diary that he saw the Grand Train come in, "a beautiful sight". The popular story that the university banned a central station is probably a myth: the land to the west was simply too built up, and the university merely refused to sell.
2 August 1845: Publication
Four days after the opening, the Illustrated London News prints a travel log of the new line, calling it a perfect illustrated itinerary. The train covers more than 57 miles from London in 2 hours 40 minutes, a boast of 28 mph that, says the paper, makes the famous Cambridge coachmen Hobson and Richard Vaughan look like the crawling of a caterpillar. The station itself is praised as light and elegant, yet sufficiently substantial.
3 June 1847: Renovation
Barely two years after opening, the company sets aside £10,000 to rework a station whose single platform is already far too narrow. The money pays for a small wooden island platform, track changes and an engine shed, as the new lines from Ely and Peterborough and from St Ives and Huntingdon add traffic. Passengers at first reach the island by walking across the rails.
July 1847: Arrival
Queen Victoria arrives by train in July for the installation of Prince Albert as Chancellor of the University. She is the most exalted passenger the new station has yet received, and the university that had been wary of the railway now has to use it to welcome its sovereign.
1850: Renovation
A second, sturdier wooden island platform replaces the first and takes over both up and down trains, while the original platform under the colonnade drops to parcels and goods. Passengers climb a steep footbridge that draws constant complaints, and luggage goes through a narrow subway that often floods.
9 October 1851: Arrival
The Newmarket line reaches Cambridge after long delay, and its trains join the main station. Its approach is an awkward sharp curve across the other tracks into what is now platform 4, left over from a plan, dropped at the last minute, for Newmarket trains to have a station of their own.
1 July 1862: Founding
The Eastern Counties Railway merges with other East Anglian companies to form the Great Eastern Railway, and Cambridge becomes one of its stations. In the same year the Bedford and Cambridge Railway opens, bringing in the cross-country route later known as the Varsity Line, run by the London and North Western Railway.
August 1862: Other
A bag is found left on a platform, addressed to a Mrs Horton of Woodbridge, Suffolk. It is forwarded, goes unclaimed, and when it begins to smell it is opened and found to hold the body of a small child. No Mrs Horton is ever traced, and the likeliest explanation is an illegitimate child abandoned by a mother fleeing disgrace.
1863: Renovation
The Great Eastern scraps the island platform and sets about a long single platform of 1,250 feet, widened by tearing down the colonnade on the track side. The extra length creates the first bay platforms, the south bay for the London and North Western and the Great Northern, and the north bay for the Midland and Newmarket trains. The platform's central supports will trouble the station for another century.
1 April 1866: Arrival
Great Northern trains begin running between Cambridge and King's Cross, giving the town a second route to London. The Great Northern keeps its own stationmaster, booking office and cab rank beside the Great Eastern station, built by the Great Eastern and paid for in rent, though the building work leaves the Great Eastern in debt to its partner.
28 June 1873: Other
While the Shah of Persia is touring Britain, the Mayor of Cambridge receives word of an unexpected royal visit, and the town's officials gather at the station to greet him. The Shah never comes: the telegram is a hoax. Two weeks later Josiah Chater records that it has been traced to a Mr Neville, a man earlier mixed up in a "stench business" at the YMCA rooms.
1882: Other
The Great Northern and Great Eastern Joint Railway opens, giving a coal route from the north-east to East Anglia. Through trains now run between London, Cambridge and York, and Cambridge becomes a junction of five companies' lines.
31 August 1894: Disaster
A London and North Western train from Bletchley runs into the buffers of the south bay at about 10 mph, leaving cuts and bruises but no deaths. The Board of Trade inspector blames the guard for failing to apply his handbrake, since the company's rule leaves the stopping of terminal trains to handbrakes rather than the driver's vacuum brake. The driver, Frederick Downs, has thirty years' service and blames greasy rails.
1 February 1897: Other
After several accidents since 1883, the Great Eastern station is declared dangerous and a wholly new one is proposed, on an extension of Mill Road, on Coldham's Common or at Hyde Park Corner. Like the rebuilding plans of 1886 and 1893, which the university and townspeople had resisted, it is never carried out, and the long single platform stays.
22 January 1909: Disaster
Two goods trains collide on the approach beneath Mill Road bridge, derailing a locomotive and four wagons and scattering granite across the line. Services are badly disrupted, and large crowds gather on the bridge to watch the long clearance.
26 July 1916: Other
Arthur Peacocke, newly made Stationmaster at Cambridge, receives the Royal Victorian Medal from King George V for his long service in charge of the Great Eastern's Royal Train. He has lived on Mill Road for more than fifteen years, so the town knows him well.
1918: Arrival
Crowds fill the station for the return of the Cambridgeshire Regiment from the First World War, the platform that had seen the men off now receiving the survivors.
30 January 1941: Other
A German bomber follows the railway line in the afternoon and drops bombs near the Mill Road bridge, flattening the Railway Cottages where railwaymen's families live. A mother and her three-year-old son are dug out from under their staircase, and the bomb leaves a gap in the bridge railing that stays unmended until after the war.
9 February 1952: Commemoration
The funeral train of King George VI, bound from Sandringham to London, passes through Cambridge. Hundreds gather at the station crossing and more than 800 line the marshalling yards beside Mill Road bridge, while railwaymen stand bareheaded near Hills Road bridge as the young Queen Elizabeth II is seen looking out from the train. The station has long kept pristine locomotives for the royal train.
18 June 1962: Other
The steam locomotive shed, code 31A, closes after diesels arrive from 1958, and the buildings are demolished in 1965. The same day the Mildenhall branch loses its passenger trains, as British Railways pares back the lines that once converged on Cambridge.
30 December 1967: Other
British Railways withdraws passenger trains between Bedford and Cambridge, ending the Varsity Line's service into the station and Cambridge's direct link towards Oxford. The Stour Valley route through Haverhill and Sudbury had closed in March of the same year.
1981: Discovery
British Rail track workers uncover the Victorian luggage subway and the foundations of the island platform, forgotten for over a century since the 1860s rebuilding. The subway is probably infilled today.
1987: Renovation
The Bishop's Stortford to Cambridge line is electrified, and electric trains run from Liverpool Street. A £650,000 refurbishment of the station, paid for by Network SouthEast, the Railway Heritage Trust and Cambridge City Council, comes in the same year.
1991: Other
The Stansted Airport link opens from Liverpool Street, bringing airport traffic into Cambridge's trains and non-stop services to King's Cross over the Cambridge line.
December 2011: Construction
A new island platform, platforms 7 and 8, comes into use for 12-car trains, the first new through platform since the station opened apart from the short-lived island platforms of the mid nineteenth century. The long original platform no longer carries every through train alone.
30 May 2015: Disaster
A Great Northern service from King's Cross overruns its platform and hits a stationary train, slightly injuring three people.
2017: Commemoration
A larger concourse with more ticket gates and machines opens in January, and the station wins Large Station of the Year at the National Rail Awards. It now handles over ten million passengers a year, the busiest in the East of England.