Cambridge Co-operative Society headquarters and hall
The Burleigh Street headquarters of the Cambridge Co-operative Society, a department store with a members' hall on its top floor, built in 1899 to 1900 to designs by F.E.L. Harris. It was extended between the wars, served as the society's home for nearly a century, and was demolished in 2003. Its site on Burleigh Street (62 to 74) is now occupied by Primark. Also known as the Cambridge Co-operative Hall.
Timeline
May 1868: Founding
The Cambridge Co-operative Society is registered with just 50 members. It grows slowly at first, and by 1896 its capital stands at only £44 and its yearly trade at £2,111, before the great push towards a purpose-built home on Burleigh Street.
September 1899: Construction
Building begins on the society's new headquarters in Burleigh Street. F.E.L. Harris, architect to the Co-operative Wholesale Society in Manchester, has designed it, and Thoday and Co. of Hills Road raise it under clerk of works Edward Vickers. A great hall, seventy feet long, is planned for the top floor above the shops.
January 1900: Founding
Society secretary Ben Mills formally opens the new headquarters. Butchery, drapery and boot departments fill the ground floor, and the hall above is lit by electric light, with gas as a backup. The mayor, a guest at the ceremony, says he hopes the society will one day run its own water works and tramways, and the society's trade of £51,513 in the previous year shows how far it has come from its small beginnings.
2 May 1928: Commemoration
The society marks its sixtieth anniversary. Members who have each belonged for at least forty years are gathered and photographed, living proof of how far the society has come since its first 50 members.
1937: Renovation
An inter-war extension enlarges the headquarters, reflecting the society's prosperity. The Victorian frontage is kept and added to, and the building becomes one of the finest local examples of Victorian retail architecture.
1980: Transfer
The society sells off its grand headquarters on Burleigh Street. It is the first sign of the decline that follows, and the hall that once held members' feasts and meetings falls out of its hands.
December 1984: Renovation
A £1.4 million redevelopment reopens the store just before Christmas, timed for the opening of the Grafton Centre. It gains an escalator, lifts, a coffee lounge and a hairdressing salon, while the distinctive upper facade is cleaned and kept. Some 60 people work there, but heavy development loans taken in a time of high interest rates soon bring the society down.
c. 2003: Destruction
The old headquarters is demolished in the spring, after nearly a hundred years as the Co-operative Society's home. A new building rises on the site, and Primark comes to occupy the whole of it.