Britannia Bridge
Robert Stephenson dares to carry a railway across the Menai Strait inside two giant wrought iron tubes, with no chains to hold them up, high enough for a fully rigged warship to pass beneath. The tubes are built on the shore, floated out on pontoons and jacked up onto masonry towers, and the bridge opens in 1850 as part of the Chester and Holyhead Railway. It takes its name from the Britannia Rock, on which the central tower stands. A fire in May 1970 destroys the tubes, and the bridge is rebuilt on the same towers as a steel arch, with a road deck for the A55 added in 1980. Four limestone lions by John Thomas still guard the abutments.
Timeline
February 1846: Other
Stephenson reports to the railway directors with a bold answer: iron tubes through which trains will run. William Fairbairn, his father's old friend, has designed the rectangular section, and Eaton Hodgkinson, the leading authority on the strength of iron beams, has tested it. Fairbairn at first thinks chains are needed, as on a suspension bridge, but model tests and calculation persuade Stephenson that the tubes can stand alone.
10 April 1846: Construction
The foundation stone is laid for a bridge that has no precedent. Robert Stephenson must carry the Chester and Holyhead Railway across the Menai Strait, and the Admiralty demands enough clearance beneath for tall sailing ships. Telford's road bridge a mile away has already been judged unsuitable for trains, so a second crossing rises on the Britannia Rock in midstream.
10 August 1847: Construction
The first rivet is driven into the tube plates. Thousands more follow, as the tubes are built on the Caernarfon shore of the strait, under Stephenson's resident engineer Edwin Clark.
20 June 1849: Other
The first tube is floated out on pontoons while Stephenson and Isambard Kingdom Brunel watch. The current nearly sweeps it out to sea before it is secured. Each tube then has to be raised by hydraulic jacks to the top of the towers, a method so new that it reportedly costs Stephenson sleep.
5 March 1850: Construction
Stephenson fits the last rivet and the bridge is complete after almost four years. Each main span is 460 feet and the tubes are joined into one continuous girder of 1,511 feet. At the time it is the longest continuous wrought iron span in the world.
18 March 1850: Founding
The first tube opens to trains, and the second follows in October. Passengers and mail now run by rail from London through Chester to Holyhead, and on to Dublin by packet. The four limestone lions carved by John Thomas, each about 25 feet long, watch over the abutments.
23 May 1970: Disaster
On a Saturday evening, boys looking for bats and birds' nests inside the tubes drop a flame onto the tarred hessian and timber roof above the tubes. Firefighters from Bangor, who call for more pumps at 21:43, 22:07 and 22:24, cannot reach it: there is no pressure water and the strait lies 450 yards away down steep slopes. The fire runs unchecked along the roof void and is stopped only at the Anglesey entrance tower, the heat buckling the tubes beyond repair.
24 May 1970: Other
The Secretary of State for Wales, George Thomas, visits the ruined bridge the morning after and praises the firefighters. Crews spend the day fighting smouldering fires in the tower masonry, lit by falling timber. Anglesey is cut off from the mainland railway.
30 January 1972: Construction
Trains cross again, on a single line over new steel arches built on Stephenson's towers. Husband and Co designed the replacement and the Cleveland Bridge and Engineering Company built it. Stephenson's tubes are gone, though one is briefly reused.
July 1980: Construction
The Prince of Wales opens a road deck above the railway, carrying the A5, now the A55, to Anglesey. The bridge becomes two crossings in one, with the rail line below. The lions can now be seen only from trains and from below, not from the road.
2011: Renovation
A four million pound, four-month programme by Network Rail, the Welsh Government and the Highways Agency strengthens the structure and restores the parapets and steelwork. The Grade II listed bridge still carries both trains and the A55.