Brentwood railway station

Brentwood station on the Great Eastern Main Line in Essex opens in 1840 as the temporary end of the Eastern Counties Railway's track from London, at the foot of a steep bank that needs extra engines to climb. Its most remarkable chapter is a run of accidents and a wartime raid, among them a fog-bound death of nine workmen in 1850 and the 1941 collision on the bank that kills seven. It has also gone by the names Brentwood & Warley for Billericay (1882) and Brentwood & Warley (1889), and returned to plain Brentwood in 1969. Since 2022 it is served by the Elizabeth line.

Timeline

1836: Other

The first proposals for a railway through Brentwood meet strong opposition from Lord Petre of Thorndon Hall, who does not want the line crossing his estate. He pushes for a bypass of the town and ends up receiving £120,000 from the railway company. Parliament approves the line in 1838.

1 July 1840: Founding

The Eastern Counties Railway opens Brentwood station on 1 July 1840 as the temporary end of its line from London. The first buildings are wooden, and a small turntable is laid for engines, which are kept here to help trains up the steep bank beyond. London is about 45 minutes away.

August 1840: Disaster

Barely a month after opening, a speeding train is derailed at Brentwood and four people are killed.

September 1840: Other

Local auctioneer Josiah Thorrowgood steals a train from Brentwood station and crashes it into a horse carriage and a coal cart. The damage is minor and nobody is hurt.

1843: Transfer

The line is extended towards Colchester and Brentwood stops being the end of the track. The engines kept here to help trains up the bank stay on, and the turntable is enlarged by 1845.

19 September 1850: Disaster

In dense fog a train runs down a gang of workmen near Brentwood and kills nine of them. The coroner's jury criticises the Eastern Counties Railway for failing to protect the men at their work.

1 November 1882: Other

The Great Eastern Railway, which took the line over in 1862, renames the station Brentwood & Warley for Billericay. A branch towards Southend is proposed at the same time, though it is eventually built from Shenfield instead. The name is shortened to Brentwood & Warley in 1889.

20 November 1902: Disaster

An Ipswich to Liverpool Street train stands at the station when an empty train leaving a siding runs into its rear. About 80 passengers are injured. The Board of Trade finds the empty train was moving at no more than four or five miles an hour.

8 July 1926: Disaster

A passenger and mail train from Liverpool Street runs head-on into a pilot engine as it approaches the station, injuring twelve people. The passenger train is going about 10 mph and the engine is almost or quite stationary. Errors by the driver and the shunter, and excessive speed, are blamed.

1934: Construction

The LNER doubles the tracks through the station from two to four. Two new platforms open on the south side with a new booking office, and the old bell tower, which once rang as trains departed, is pulled down.

6 January 1941: Disaster

A lone German bomber dives out of cloud at about 10am and drops bombs around the station. Eric Frank Bridgeman, an 18-year-old railway worker whose father is a clerk at the station, is killed, and about 20 people are wounded. The booking office is wrecked and hardly a pane of glass is left in the canopies.

10 February 1941: Disaster

A Liverpool Street to Norwich express runs short of steam and stalls on the bank between Harold Wood and Brentwood. About eight minutes later a Southend Victoria stopping train passes a signal at danger and hits its rear at about 30 mph. Seven people are killed and 19 seriously injured. The Southend driver, a fit and experienced man, fully admits his responsibility, and the inquiry calls such a lapse difficult to explain.

7 November 1949: Transfer

The full electric service to Shenfield begins, a scheme put on hold when war broke out. Electric trains have run since 26 September, still on steam timings and alongside some steam trains. The engine shed that served the climb up the bank has closed that year.

20 February 1969: Other

The station drops the Warley part of its name and is plain Brentwood again, as it was in 1840.

2010: Renovation

National Express East Anglia begins a £1.5 million improvement programme. It brings a larger entrance and ticket hall, refurbished waiting rooms and provision for lifts to the platforms.

May 2015: Transfer

TfL Rail takes over the stopping service to Shenfield.

May 2022: Transfer

TfL Rail becomes part of the Elizabeth line, and trains now run through to Paddington, some on to Heathrow Terminal 5. Station entries and exits climb from 1.86 million in the first year to 3.71 million two years later.