Blackwall Tunnel
The Blackwall Tunnel is a pair of road tunnels under the Thames between Blackwall in Tower Hamlets and the Greenwich Peninsula, carrying the A102. When the first bore opened in 1897 it was the largest underwater tunnel yet built, and for more than a century it was a free crossing, a fact that ended only in 2025. The Victorian bore, designed by Alexander Binnie for the London County Council, was joined in 1967 by a second bore for southbound traffic, and the pair are now notorious for delays. Its name comes from Blackwall, the place it serves. The curving Victorian gatehouse at Greenwich and Terry Farrell's sculptural ventilation towers are what a visitor sees today.
Timeline
March 1892: Construction
Work starts on a single tunnel big enough for two lines of vehicles and two footpaths. Parliament empowered the Metropolitan Board of Works in 1887 to cross here, but the London County Council that took over in 1889 backs Alexander Binnie's plan, and S. Pearson and Son win the contract at £871,000. By the end of the year gangs are digging the approaches on both banks while piles go into the river bed at Northumberland Wharf.
September 1893: Construction
Tunnelling under the river itself begins from the Kent side, using a giant steel shield designed by the contractors' engineer E. W. Moir and compressed air to hold the water back. In places the roof of the tunnel lies only five or six feet below the river bed, so a bed of clay ten feet thick is dumped from barges to stop the air blowing out. About 800 men work on the job and seven die before it is done.
22 May 1897: Commemoration
The Prince of Wales, later Edward VII, opens the tunnel, with the Princess at his side, to crowds from the East End. At 27 feet across and over 6,000 feet long it has cost £1.4 million and is the largest underwater tunnel yet built. It is free to use, and the first traffic is mostly dock and railway vans, with local workers on both banks quickly taking to the new way across.
August 1947: Other
Horse traffic is banned from the tunnel altogether, ending the age that the Victorian bore was built for. Horses had been kept out at peak hours since July 1939, as motor lorries and cars crowded in beside the carts.
April 1958: Construction
Work finally begins on the duplication that the London County Council had authorised in 1938 and the war had put off. The northern approach is rebuilt for eight lanes, and the Art Nouveau north gatehouse, with its turrets and bronze plaques, is pulled down. The approach road opens on 27 June 1960 and digging of the second tunnel follows.
May 1964: Construction
Beneath the river, the two shields driving the new tunnel meet. They are Greathead shields reconditioned after use on the Dartford Tunnel, and the ground ahead of them had been sealed with a chemical compound. Balfour Beatty and its partners then fit out the bore.
2 August 1967: Commemoration
Desmond Plummer, Leader of the Greater London Council, opens the second tunnel, 1,174 metres long and 8.59 metres across, at a double ceremony that also starts work on the southern approach. The bore costs about £7 million and carries southbound traffic, and Terry Farrell's curving ventilation buildings rise at its ends. The Victorian bore closes for improvements.
May 1969: Other
Pedestrians are barred, ending seventy-two years in which people could walk under the Thames beside the traffic. The Victorian bore had reopened on 4 April with an electronic system to catch overheight vehicles, and a month later it becomes a road for vehicles only.
18 January 1979: Disaster
After an IRA warning, a bomb goes off at 12:40 am near the southern exit and blows up a gas holder. A second gas holder burns about an hour later. Nobody is hurt, and in May 1983 a Belfast man is jailed for the attack.
10 December 1996: Disaster
A Mercedes truck carrying a crane drives into the southbound gantry, and the tunnel is shut completely. The Limehouse Link and the Queen Elizabeth II Bridge close the same day, and east London's river crossings seize up.
April 2007: Other
The morning tidal flow scheme ends. Since 1978 the system had turned lanes over to rush-hour traffic, and its removal is controversial and prompts an independent review.
7 April 2025: Other
Tolls begin on the Blackwall Tunnel and the new Silvertown Tunnel, ending 128 years of free passage. Silvertown, a twin bore 0.9 miles to the west, was begun in March 2021 to ease the pressure on Blackwall. Peak charges are £4.20 for a car and £10.50 for a lorry.