Bath Abbey
At its height Bath Abbey is a Norman cathedral priory, one of the richest religious houses in Somerset, with a church some 330 feet long and a cloister among the largest in the country. It begins as a convent of nuns founded about 675, becomes a royal minster where Edgar is crowned first king of all England in 973, and is gutted at the Dissolution in 1539. Citizens, bishops and a queen's national appeal then raise the surviving nave and choir into the present late Gothic church, famous for its fan vaulting, its west front of angels climbing ladders and its hundreds of memorials. It is formally the Abbey Church of Saint Peter and Saint Paul, a Church of England parish church in the Diocese of Bath and Wells, and has also been called the Great Church, the Priory Church and the Lantern of the West.
Timeline
675: Founding
Osric, under-king of the Hwicce, grants the Abbess Bertana 100 hides of land near the hot springs to found a monastery of holy virgins. It is the first religious community known on the site, and every later church here grows from it. The nuns vanish from the record within a few generations.
781: Transfer
At the Synod of Brentford the Bishop of Worcester hands the monastery at Bath back to King Offa of Mercia. Offa calls it that most famous monastery, and Bath becomes royal land. Tradition says he rebuilds the church, perhaps on the site of an older temple.
11 May 973: Coronation
On Whitsunday, Archbishop Dunstan and Bishop Oswald crown Edgar at Bath, at the end of a reforming reign that has restored Benedictine monasticism. He is hailed as first king of all England, and the service later becomes the model for English coronations. A plaque at the east end still records the day.
c. 980: Arrival
Ælfheah, later known as Alphege, comes from Deerhurst, first as a hermit and then gathering a community around him as abbot. He repairs the church and brings in the Rule of St Benedict, though some of his monks lapse into drunkenness. He goes on to become Bishop of Winchester in 983 and Archbishop of Canterbury in 1012, and is martyred by the Danes the same year.
1088: Destruction
Robert de Mowbray burns Bath during the struggle between the sons of the Conqueror, leaving the old church damaged. The abbey's fortunes then turn on the king's own doctor.
1088: Transfer
William Rufus gives the abbey to John of Tours, a Frenchman and the royal physician, who is already Bishop of Wells. John is licensed to move his bishop's seat to Bath, and in 1091 buys the city itself for 500 pounds of silver. The English monks lose their endowments and Normans replace many of them, and the abbey is ruled by a prior from then on.
1090: Construction
Bishop John makes St Peter's his cathedral and begins an enormous new church, planned on a scale that would reach almost to the present Grand Parade. Only the ambulatory is finished when he dies. The old Saxon church is swept away.
29 December 1122: Death
John of Tours dies and is buried before the altar of the Virgin Mary in his unfinished cathedral. A marble tomb is still pointed out to visitors four centuries later.
29 July 1137: Disaster
Fire devastates the half-finished cathedral. Bishop Robert of Lewes, who is captured by the Bristol garrison and swapped for another prisoner during the civil war of Stephen's reign, rebuilds, adding chapter house, cloister, dormitory, refectory and infirmary. The finished church is about 330 feet long.
1197: Other
Bishop Savaric, kin of the Emperor, wins the abbacy of Glastonbury and moves his seat there with the Pope's approval, styling himself Bishop of Bath and Glastonbury. The Bath monks refuse to accept it, and his successor Jocelin brings the seat back to Bath. The quarrel over where the bishop belongs between Bath, Wells and Glastonbury runs for decades.
1245: Other
Pope Innocent IV settles the rivalry by making Bath and Wells joint cathedrals, with Roger of Salisbury as first Bishop of Bath and Wells. The Wells canons keep petitioning, and later bishops prefer Wells, so the priory slowly loses its standing as a cathedral.
June 1295: Other
The prior of Bath is summoned to the Great Council at Westminster and takes his seat in Parliament. It shows how much weight the house carries as one of the richest in Somerset.
c. 1300: Renovation
The great Norman cloister is cut down and the monks' choir moved west, in one operation, in the early years of the new century. The cloister garth had been used as an extra cemetery and is now built over. The change leaves a dormitory that leads straight into the nave.
1499: Construction
Prior Birde pulls down the old Norman church and begins a much smaller one on the line of its nave, designed by the royal master masons Robert and William Vertue. They promise a vault finer than any in England or France. King's west front shows angels climbing ladders to heaven beside his rebus of an olive tree and crown, and a legend later grows that a dream of such a ladder inspired it.
July 1499: Other
Bishop Oliver King, formerly Henry VII's secretary, visits the priory and finds the church ruined and the monks feasting outside the refectory, with women in the precinct at unseemly hours. Prior Cantlow dies that August, and William Birde takes his place. King resolves on a new church and sets aside 300 pounds a year of priory income to pay for it.
7 August 1535: Other
Richard Layton, Thomas Cromwell's visitor, writes that the prior is a right virtuous man but the monks are guilty of buggery and adultery, one with ten women and another with eight. The house is £400 in debt. His injunction in September confines the monks to the precinct, and Prior Holleway writes anxiously to Cromwell.
1539: Destruction
The Crown strips the unfinished church of its lead, worth about £4,800, as well as its glass and iron, and leaves it roofless. The citizens are reportedly offered the building for 500 marks and refuse. Cloister, dormitory and refectory are sold off for building stone.
27 January 1539: Transfer
Prior William Holleway, the sub-prior and eighteen monks surrender the priory to the Crown's commissioners, Tregonwell and Petre. Holleway receives a pension of £80 and a house in Stall Street, and the monks get between £4 and £9. Nearly 900 years of monastic life on the site end.
1572: Transfer
Edmund Colthurst, whose father bought the priory site in 1543, grants the ruined church to the city, and Elizabeth I gives the corporation the patronage of its parish churches. The citizens want a grand church to impress the nobles who come each spring and autumn to take the waters. Bath's parish church is now the old cathedral's ruined nave and choir.
April 1573: Other
Elizabeth I licenses a seven-year collection across the whole kingdom to rebuild the abbey. A proclamation read out in churches calls Bath the hospital of the nation. The east end is repaired first, and a date of 1573 is carved on a west front mullion.
1616: Renovation
James Montagu, Bishop of Bath and Wells, pays £1,000 and gives Mendip lead to roof the nave, supposedly after sheltering in the roofless church during a thunderstorm. Noblemen supply timber, and the restoration is complete by the time he moves to Winchester. Services had long been held in the east end alone, with the nave a promenade and short cut.
1617: Other
Sir Henry Montagu, the bishop's brother and Lord Chief Justice, presents the carved oak west doors bearing the Montagu arms. They are the last touch of a restoration that has taken some 45 years, longer than the original building.
1618: Death
Bishop James Montagu dies and is buried in an alabaster tomb in the north aisle, though he has left the diocese and the abbey is no longer a cathedral. He wants his burial to stir up more benefactors for the church. The tomb begins the abbey's long role as Bath's place of memorial.
1723: Other
General Wade's passage is cut beside the church, ending the use of the nave as a short cut from Abbey Churchyard to the Grove. By then houses and shops cling to the walls, among them a pastry-cook's oven chimney built up a buttress. Memorial tablets crowd the piers, reflecting how fashionable Bath society buries its dead here.
1770: Other
Two lighter bells are added to the eight hung in 1700, making the first ring of ten bells in the diocese. The bells are hung so that their order runs anticlockwise around the ringing chamber.
1833: Renovation
The city architect George Phillips Manners clears the last houses, shops and taverns from the walls, a clearance the corporation began in 1822, leaving the church freestanding for the first time since the Reformation. He adds flying buttresses and pinnacles and remodels the interior. Most of his work is later undone.
1834: Death
Thomas Robert Malthus, the economist whose essay on population shaped Darwin's thinking, dies and is buried in the abbey. His grave is among the many notable burials in a church holding hundreds of wall memorials and floor stones.
1864: Renovation
Sir George Gilbert Scott begins a ten-year restoration commissioned by the rector, Charles Kemble. He replaces the timber nave roof with stone fan vaulting like that in the choir, and removes the galleries and the 1835 screen. His Victorian pews survive as one of the country's most extensive suites.
1895: Renovation
Scott's pupil Thomas Graham Jackson spends six years restoring the west front and installs a new organ. Sculptor George Frampton adds a statue of Henry VII and the seated Christ above the window.
1923: Commemoration
Jackson begins the War Memorial Cloister along the south side of the nave, finished in 1927, with the Norman chapel turned into a memorial chapel. The new cloister stands on part of the site of the much larger Norman one.
1992: Renovation
The west front is cleaned and consolidated with lime, the exterior brought back to its warm yellow, after earlier cement repairs had worsened the damage. The crypt opens as the Abbey Vaults museum.
May 2018: Renovation
The Footprint Project begins, funded in large part by the National Lottery Heritage Fund, to stabilise a floor undermined by centuries of burials. In August a medieval tiled floor of the late 13th or early 14th century is uncovered, coffins are reburied, and the pews give way to chairs. Heating drawn from the 40 degree hot spring water now warms the church, and new spaces below the floor hold choir rooms, learning rooms and a permanent exhibition.