Bank station

Beneath the City of London's financial heart, Bank is a maze of tunnels that joins four railways, the Central, Northern and Waterloo and City lines and the Docklands Light Railway, and links through to Monument station on the District and Circle lines. It grew from three separate deep-level stations opened between 1898 and 1900, the Waterloo and City platforms, first called City, being renamed Bank only in 1940. In 1941 a German bomb on the Central line ticket hall killed 56 shelterers and left a crater in the road. Its tunnels run under St Mary Woolnoth church, the Bank of England and the Royal Exchange, which is why it was built the way it was. A 700 million pound upgrade, finished in 2023, was meant to ease the crush of passengers.

Timeline

8 August 1898: Founding

The Waterloo and City Railway opens on 8 August 1898, a shuttle built by the London and South Western Railway to carry its passengers from Waterloo terminus under the Thames to the City. Its platforms near Mansion House are called City, not Bank. When the builders finish, they leave a Greathead tunnelling shield, designed by the engineer James Henry Greathead, in the ground 18 metres down.

24 February 1900: Other

King William Street station, the City terminus of the City and South London Railway, closes on 24 February 1900, less than ten years after it opened as part of the world's first deep tube line. Its steep approach was a trouble from the start, with locomotives sometimes stalling and being pushed up by the next train. The line is rerouted to a new station at Bank, and the old one later serves as a wartime shelter and a store.

1900: Construction

To fit the ticket hall under St Mary Woolnoth, the builders move the bodies from the crypt, frame it in steel and underpin the church's foundations. The railway takes its case to the House of Lords without success and pays the church authorities 170,000 pounds in compensation. The church still stands on the corner of Lombard Street, with a station entrance in its fabric.

25 February 1900: Founding

The City and South London Railway opens the first station actually named Bank on 25 February 1900, as part of its extension from Borough to Moorgate. The station has no surface building, and passengers reach the platforms by electric lift. The ticket hall is dug out of the crypt of St Mary Woolnoth church, after protest stopped plans to demolish the church outright.

30 July 1900: Founding

The Central London Railway opens its eastern terminus at Bank on 30 July 1900, running from Shepherds Bush. To protect the Royal Exchange, Bank of England and Mansion House it is built wholly underground, with lifts in separate shafts and tunnels kept under public streets, and the City Corporation insists on public subways as pedestrian crossings. The platforms under Threadneedle Street and Poultry are curved, so one end cannot be seen from the other.

1920s: Construction

Escalators finally join the Central London and City and South London platforms in the 1920s, after years in which the two stations shared only passages. The Central line station is rebuilt around 1925 while the Bank of England is rebuilt above it, with a redecorated booking hall under Bank Junction.

18 September 1933: Construction

On 18 September 1933 an escalator link opens between Bank and Monument, joining the Northern line platforms to the District and Circle line station. It is the only place where two Underground stations are connected in this way. The tiles show the supporters of the City of London arms.

28 October 1940: Other

The Waterloo and City platforms, open as City since 1898, are renamed Bank on 28 October 1940. The renaming comes in the second month of the Blitz, when the Underground is officially used as an air raid shelter and the station fills each night with sheltering Londoners.

11 January 1941: Disaster

On the evening of 11 January 1941 a high explosive bomb punches through the road and explodes in the Central line escalator machine room. The blast tears down the subway and the road junction above and rushes down the escalator shaft to the platforms, where people are sheltering. It kills 56 and seriously injures 69, and a number 21 bus drives into the crater later that night.

January 1941: Construction

In the days after the bombing the Pioneer Corps clear the debris and Royal Engineers throw a Bailey bridge across the crater, 120 by 100 feet, so City traffic can keep crossing. Remarkably, trains keep running through the station, and Central line services resume at 07:11 the next morning, though the main station stays shut for two months. Shelterers use the Underground until May 1945.

September 1960: Construction

In September 1960 two Otis moving pavements, called Trav-o-lators, open between the Waterloo and City platforms and the rest of the complex. Each is 92 metres (303 feet) long, and an old subway to Poultry is abandoned and a sewer diverted to make room. Their construction was beset with problems, and they are among the earliest moving walkways on the Underground.

1987: Discovery

Contractors Edmund Nuttall, digging the Docklands Light Railway extension to the City, uncover a Greathead tunnelling shield that the builders of the Waterloo and City line left in the ground in 1898. The new passage to the Waterloo and City platforms is built through it, and passengers still walk through the iron arch today.

29 July 1991: Construction

The Docklands Light Railway reaches Bank on 29 July 1991, after its Tower Gateway terminus was criticised as poorly connected. The DLR platforms run parallel to the Northern line but deeper, with links to the Central line and Monument, giving the City a direct link to Docklands.

1994: Commemoration

In January 1994 a statue of James Henry Greathead, the engineer whose tunnelling shield drove the Waterloo and City and the City and South London lines under London, is unveiled beside the Royal Exchange by the Lord Mayor. Its plinth hides a ventilation shaft for the station below.

7 September 2003: Other

On 7 September 2003 about 500 police, fire, ambulance and Underground staff stage Exercise Osiris in the station, a drill for a chemical, biological or radiological attack. It is billed as the most realistic live disaster exercise of its kind, and includes mass decontamination.

April 2016: Construction

Digging begins in April 2016 on a new Northern line southbound tunnel, started from a worksite at the old King William Street station. Demand has risen by more than half since 2003 to 337,000 passengers a day, and Transport for London says parts of the station are near saturation. By October 2020 about 1.3 kilometres have been tunnelled and 200,000 tonnes of earth removed.

30 November 2018: Construction

A new Walbrook entrance opens on 30 November 2018 at the Bloomberg London building, giving the Waterloo and City line its first step-free access by four escalators and two lifts. Sadiq Khan and Michael Bloomberg open it officially in December. The building's glass panels by John Hutton show 66 figures, including Roman history from the nearby Temple of Mithras.

15 May 2022: Construction

After the Northern line has been shut through Bank for 17 weeks, the new southbound platform opens on 15 May 2022, the heart of the 700 million pound upgrade. The old platform becomes a passenger concourse. Escalators from the Docklands Light Railway to the Northern line open on 13 October, and a moving walkway from the Central line follows on 28 October.

27 February 2023: Construction

The upgrade is finished on 27 February 2023, when the new Cannon Street entrance and its lifts open, after seven years of work. Capacity rises by 40 per cent, with 12 new escalators, 2 lifts and 2 moving walkways, and the station now has 16 entrances and 5 ticket halls. The project wins the National Rail Awards Major Project of the Year in 2024.